College Park House Reception Refurb
Design: The Building Consultancy
Value: €200,000 (approximately)
Duration: 4 Weeks
Scope of Works:
Stripout and refurbishment of existing Entrance Lobby and Reception of College Park House. The building remained Live throughout though tenants were able to occasionally use alternative access. Works entailed:
- Alterations and extension of the existing Mechanical systems- HVAC, Plumbing and drainage
- Alterations and extension of the existing Electrical installation to include General services, Lighting, Data, power, Access Control, Fire Alarm, LED lighting
- Installation of feature wall finishes to include Living Walls and timber linings
- Bespoke joinery to include Reception desk
- Installation of large format Porcelain tile flooring
- New Plasterboard feature ceilings
- Feature LED strip lighting
- Installation of Branding package to include manifestations & signage
- Furniture
The project was successfully completed in 4 weeks which was tight enough given the level of finishes and tight work area