College Park House

College Park House Reception Refurb

Design:  The Building Consultancy
Value:  €200,000 (approximately)
Duration: 4 Weeks

 

Scope of Works:

Stripout and refurbishment of existing Entrance Lobby and Reception of College Park House. The building remained Live throughout though tenants were able to occasionally use alternative access. Works entailed:

 

  • Alterations and extension of the existing Mechanical systems- HVAC, Plumbing and drainage
  • Alterations and extension of the existing Electrical installation to include General services, Lighting, Data, power, Access Control, Fire Alarm, LED lighting
  • Installation of feature wall finishes to include Living Walls and timber linings
  • Bespoke joinery to include Reception desk
  • Installation of large format Porcelain tile flooring
  • New Plasterboard feature ceilings
  • Feature LED strip lighting
  • Installation of Branding package to include manifestations & signage
  • Furniture

The project was successfully completed in 4 weeks which was tight enough given the level of finishes and tight work area